Coroplast Sign Installation - PVC Pipe Frames

Materials Needed for Each Frame:
(2) 7’ Lengths of 1 1/4” PVC
(1) 8’ Length of 1 1/4” PVC
(2) 90 deg. Elbows
(2) 5’ lengths of 5/8” Re-Bar
Approx. 14 “Zip Ties” or “Cable Ties”

STEPS:
1) Cut Re-Bar & PVC to Length
2) Assemble & Glue PVC Frame
3) Drive Re-Bar into Ground
4) Attach Sign to PVC Frame w/ Zip Ties by
cutting slit in plastic and looping zip tie around
5) Slide PVC Frame over Re-Bar

 

coroplast sign pipe frame installation